Padarn Surgery
Aber Heating Engineers recently completed the Mechanical Refurbishment of a section of an existing GP surgery in Aberystwyth in order to form a medical training facility that will be used by Swansea University. The Project involved the Design and Build of :...
The Ser Cymru Laboratory at Aberystwyth University
Aber Heating Engineers recently completed a project at Aberystwyth university. Project consisted of state of the art mechanical fit out consisting of : MVHR ventilation systemsCo2 gas systemsNitrogen systemsNatural gas Gas monitoring systemsRoom pressure...
Tai Ceredigion: 33 Unit Social Housing Development
Aber Heating Engineers have recently completed the mechanical package on Tai Ceredigion's new 33 unit social housing development. The development involves the design and construction of 33 affordable flats on the site of the Aberystwyth Football Ground. The flats...
Bronglais General Hospital – Aberystwyth
New MRI scanner now in place at Bronglais Hospital Aber Heating Engineers were appointed in 2019 to complete the mechanical services package involved with the new MRI scanner at Bronglais Hospital, Aberystwyth. There were many specialist aspects to this project such...
William Davies
As part of Aberystwyth Universities bid to reduce it’s carbon footprint, William Davies - IBERS was identified as a building which would benefit from a modernised heating plant. Aber Heating Engineers were awarded the contract to provide extensive refurbishment to the...
CASE STUDY: WILLIAM DAVIES BUILDING, ABERYSTWYTH UNIVERSITY
Installation: 3 x Gas 310/610 Eco Pro high efficiency condensing boilers University cuts gas consumption by 46% with Remeha boilers Aberystwyth University has refurbished the heating plant serving its William Davies research centre with energy-saving Remeha condensing...
The Old Lifeboat Station – Queens Road Aberystwyth
Aber Heating Engineers recently completed the refurbishment of Aberystwyth's Old lifeboat station. The building was built in 1875 and over the years has had various uses including use as a BBC broadcasting studio. However in 2020 Ceredigion Archives were awarded a...
Aber Heating Engineers LTD Collaborates on West Wales COVID-19 Field Hospitals.
Aber Heating Engineers Ltd recently completed work on Ceredigion's Ysbyty Enfys Aberystwyth COVID-19 field hospital which added over 150 patient beds across two sites for the anticipated COVID-19 surge in the West Wales area. From initial contact Aber...